Transport on the Erie Canal in New York

Due to site restrictions that prohibited the bridge contractor from disturbing the river bottom, a unique Series S-70 transport barge design was utilized by Multi-Phase, Inc. to erect and install a 600-ton, 270-foot-long Warren truss bridge. The Flexifloats were configured into an approximate parallelogram to overcome canal width restraints.

Read more about this project