Transport on the O'Shaughnessy Reservoir in Ohio

The Ruhlin Company used two Series S-50 "I"-shaped transport barges to remove 130-ton bridge spans. Jacks mounted on dunnage lifted the sections from their bearing pads. The tandem barge assemblies were then floated to shore where the steel structure was dismantled.